Call Us Today! 0086-13964177675?|?sales@bogongcnc.com

How to install the rotary device

How to install the rotary device 

1. Prepare of connect lines

a. First open the control cabinet of the marking  machine.

You will find three power inside, and we will use the 24V power to supply electricity for our rotary device.

b. After you open the cabinet, you will see three lines, white, blue and yellow wire lines.

like this on the control board.

image.png 

a. Then you clamp off the wire line of the three wires and add small  plug on the wire line ends. Like this:

 

image.png


2. Connect the rotary drive and the control board, connect blue, white and yellow wire lines to rotary drive.

image.png

image.png

image.png

3. Then connect the rotary drive and 24V power. With red and blue two lines.

a. One end is the 24V power, blue and red lines, red line V+, Blue line V-.


image.png

b.One end is the rotary drive, blue and red lines, red line V+, Blue line GND(V-).

image.png


4.Then connect the rotary drive with four power line. Two group.

First weld four lines to the inside connector.

(A- A+) ,(B-B+).

image.png

image.png

image.png

image.png

CONTACT INFORMATION

Email:sales018@bogongcnc.com

wechat:Daisy17864184118
Skype/whatsappp:0086 17864184118
Phone number:0086 17864184118
website:www.bogongcnc.com


Close
CHAT ONLINE